Saturday saw the installation of the fourth of seven Senvion 2MW MM100 x 100HH wind turbines at our location in Dye, France.

This installation has continued through the arrival of a heatwave with temperatures reaching 41 degrees which had our dedicated team feeling like they were working in the conditions of an oven! We’d like to thank Noel and the rest of the team for all their hard work.