Repower

Windhoist ha completado exitosamente los proyectos siguientes para

 

  WindfarmYearTurbine TypeTower HeightQuantityTotal MW
Achany, Lairg2009MM8259M1938.00
Achairn2009MM8259M36.00
Baudignecourt2011MM92100M612.00
Bevillier2009MM82100M515.00
Bicker Fen, Lincolnshire2008MM8259M1326.00
Bretell2012MM92100M5230
Broomhill2009MM8259M48.00
Burnfoot Hill2010MM8259M1326.00
Butterwick Moor2010MM8269M1020.00
Cape Bridgewater WF, Australia2008MM8269M2958.00
Cape Nelson, Australia2008MM8269M2244.00
Caton Moor Repowering, Lancashire2006MM7059M1020.00
Coldham2012MM8259M714.00
Croda Chemicals2008MM9280M12.00
Damplerre, France2010MM9296M1224.00
Dew Lay2010MM9280M12.00
Earls Hall2012MM9080M510
Echalot2012MM92100M816
Fairburn2009MM8259M2040.00
Ffynnon Oer, Neath Port Talbot2006MM7059M1632.00
Gordonbush2012MM8269M3570
Greendykeside WF, South Lanarkshire2007MM8269M24.00
Hameldon Hill, Lancashire2007MM7055M34.50
Haswell Moor2010MM8259M510.00
Hazelhead2011MM8259M36
Hepburn2011MM8269M24.00
Kessingland2011MM9280M48.00
Knabs Ridge, Felliscliffe2007MM7058M48.00
Knabs Ridge 2, Felliscliffe2008MM7069M816.00
Langres Sud2010MM9288M2652.00
Langley2008MM8263M48.00
Lochhead2009MM8259M36.00
Longpark2009MM8259M1530.00
Longpark2009MM8269M48.00
Low Spinney, Gilmorton, Leicestershire2011MM9280M48.00
Marr2011MM9280M48
Montifilant2012MM92100M510
Muirhall2010MM9280M612.00
Ransonmoor, Cambridgeshire2008MM8269M24.00
Red Tile, Cambridgeshire2007MM8259M1224.00
Rusholme Sleby2010MM8259M1224.00
Source de la Loire2011MM8280M918
Walkway, High, County Durham2008MM8269M714.00
West Durham2009MM8259M1224.00
Zuidlob (in progress)20123xM100m36108
Total   446931.50

Windhoist have erected more than 3000 turbines giving a total installed capacity in excess of 5000MW in recent years